Title:
|
RECOFF; Task 3: Optimisation of the O&M costs to lower the energy costs
|
|
Author(s):
|
|
|
Published by:
|
Publication date:
|
ECN
Wind Energy
|
1-11-2004
|
|
ECN report number:
|
Document type:
|
ECN-C--04-109
|
ECN publication
|
|
Number of pages:
|
Full text:
|
19
|
Download PDF
|
Abstract:
A Probabilistic O&M Cost Optimisation model is presented,
with which the operation and maintenance strategy of offshore windfarms
can be improved. Basis for the application of this model is an extensive
analysis of the fault detection and repair cycle offshore. A calculation
model has been added.
Back to List