Publications

Skip Navigation Links.
Recently Published
Expand per documenttypeper documenttype
Expand per Unitper Unit
Expand per Clusterper Cluster

Search for publications:


Limit search to the fields

ECN publication
Title:
De inzet van oud papier binnen de energievoorziening viavergassing
 
Author(s):
 
Published by: Publication date:
ECN 1995
 
ECN report number: Document type:
ECN-C--94-065 ECN publication
 
Number of pages: Full text:
43 Download PDF  

Abstract:
A brief description of the paper market and the paper production processis given. It is obvious that the waste paper business is complex. A first evaluation of a biomass integrated-gasifier/combined-cycle system according to the atmospheric circulating fluidized bed gasification process, as developed by TPS Termiska Processer AB, shows that an overall system efficiency of 38% can be achieved. A plant with a capacity of 73 MWth will consume approximately 15.5 tonnes of waste paper per hour. 7 figs., 7 tabs., 1 appendix, 16 refs.


Back to List