Title:
|
Praktijkexperiment alternatieve energiebron voor LAE-signaleringsborden: tussenrapportage: installatie- en opstartfase
|
|
Author(s):
|
|
|
Published by:
|
Publication date:
|
ECN
|
1-8-1998
|
|
ECN report number:
|
Document type:
|
ECN-C--98-062
|
ECN publication
|
|
Number of pages:
|
Full text:
|
39
|
Download PDF
|
Abstract:
The title experiment concerns electricity supply for the lighting ofso-called LAE warning signs by means of a wind generator and a photovoltaic
panel. The measurements will be carried out at sites in Maarn and Wolfheze,
both Netherlands. LAE warning signs comprise sets of four signals: an L-sign,
placed at a safe distance of work that has to be carried out along the
railway (a slow-down sign), a sign for the maximum speed of the approaching
train, an A-sign right in front of place where the work along the railway is
carried out, and an E-sign to indicate the end of the work where the train
can ride a normal speed. In this report the installation and start-up of the
power supply system will be discussed as well as the selection of the sites
where the experiments will be carried out, how the measurements will be
executed and data will be analyzed
Back to List