| Title: | 
        
            | Basisbedrag warmte-uitkoppeling bij bestaande mestcovergistingsinstallaties | 
        
            |  | 
        
            | Author(s): | 
        
            |  | 
        
            |  | 
        
            | Published by: | Publication date: | 
        
            | ECN
                Policy Studies | 30-1-2012 | 
        
            |  | 
        
            | ECN report number: | Document type: | 
        
            | ECN-N--12-004 | External memo | 
        
            |  | 
        
            | Number of pages: | Full text: | 
        
            | 7 | Download PDF | 
    
    
    
        Abstract:
        The Ministry of EL&I has asked ECN to research the base rate for increased heat delivery from existing manure co-digestion installations. ECN and KEMA advise the corresponding base rate at 8,2 €/GJ, assuming a subsidy duration of 5 years and 4000 full load hours per year. In addition, ECN and KEMA advise the correction rate for this category at 0 €/GJ.
    
    
        
        
    
    
        Back to List