Title:
|
Basisbedrag warmte-uitkoppeling bij bestaande mestcovergistingsinstallaties
|
|
Author(s):
|
|
|
Published by:
|
Publication date:
|
ECN
Policy Studies
|
30-1-2012
|
|
ECN report number:
|
Document type:
|
ECN-N--12-004
|
External memo
|
|
Number of pages:
|
Full text:
|
7
|
Download PDF
|
Abstract:
The Ministry of EL&I has asked ECN to research the base rate for increased heat delivery from existing manure co-digestion installations. ECN and KEMA advise the corresponding base rate at 8,2 €/GJ, assuming a subsidy duration of 5 years and 4000 full load hours per year. In addition, ECN and KEMA advise the correction rate for this category at 0 €/GJ.
Back to List