Title:
|
CONMOW: Condition Monitoring for Offshore Wind Farms
|
|
Author(s):
|
|
|
Published by:
|
Publication date:
|
ECN
Wind Energy
|
1-6-2003
|
|
ECN report number:
|
Document type:
|
ECN-RX--03-036
|
Conference Paper
|
|
Number of pages:
|
Full text:
|
3
|
Download PDF
|
Presented at: European Wind Energy Conference 2003, Madrid, Spain, 16-19 juni 2003.
Abstract:
To investigate whether a cost-effective integral condition monitoringsystem can be realised in practice the European project CONMOW (Condition
Monitoring for Off-shore Wind Farms) was started at November 2002. In
the first phase, one single turbine, the GE 1.5S located at Zoetermeer,
is being instrumented extensively, not only with condition monitoring
techniques but also with the ?traditionally? measurement systems. In
this paper the objectives and the approach of the project are outlined.
Furthermore the instrumentation of the single wind turbine is explained.
Back to List