Title:
|
Inzet van biomassa / afvalstromen in het droogproces van GIBO
|
|
Author(s):
|
|
|
Published by:
|
Publication date:
|
ECN
|
1-9-2005
|
|
ECN report number:
|
Document type:
|
ECN-C--05-080
|
ECN publication
|
|
Number of pages:
|
Full text:
|
76
|
Download PDF
|
Abstract:
In this feasibility study the
application of biomass and waste streams as source of energy within
the existing drying facility of Gipsbouw BV (GIBO), a Dutch producer
of non-load-bearing wall-building materials made of gypsum, is examined.
The existing industrial drying process is operated non-stop for 5 days
and switched off during the weekends. It has an annual natural gas consumption
of 3.3 million m³n, which is combusted in several burners
with excess air in order to provide a drying medium with a temperature
of approximately 150°C. The base load of this system amounts to 4 MWth
heat, with peak demands up to 8 MWth heat. <%
Back to List